Corrosion-resistant centrifugal pump installation requirements

Corrosion Centrifugal Pump occupies a large proportion of the market, if the correct installation can extend the life of corrosion-resistant centrifugal pump, then how to install it becomes more and more important, then before installation, you guys Know its installation requirements? Corrosion Centrifugal Pump Installation Requirements: Corrosion Centrifugal Pump Installation Requirements Corrosion Centrifugal Pump Installation, should be selected from the nearest transport fluid, so that the pump installed in the minimum suction height and the shortest suction pipe at the Department. Note: Ensure that the distance between the unit and the surrounding obstacles is more than 150㎜, so that the motor fan has sufficient air source. Stainless steel corrosion-resistant centrifugal pump used in more stringent requirements of vibration, you can use the shock absorber (cushion), according to the manufacturer's instructions for installation. Stainless steel corrosion-resistant centrifugal pump installation should be securely fixed, close to the pump flange pipe support should be sufficiently rigid, not to allow the pump to withstand the weight of the pipeline pressure. Corrosion-resistant centrifugal pump group installation should avoid direct sunlight and rain. 316,304 material stainless steel strong corrosion-resistant centrifugal pump imports should be installed vacuum pressure gauge, flange outlet pressure gauge should be installed to observe and control the operation of the pump. Pressure gauge range should be 2 to 3 times the actual pressure is appropriate. 316 material stainless steel corrosion-resistant centrifugal pump import and export pipeline should be installed gate valve to facilitate maintenance and operation of the regulation. Wiring: must be the correct nameplate requirements wiring, wiring, the terminal must be solid, not allowed to loose, otherwise, will result in poor contact caused by lack of phase burning machine. To ensure the reliable operation of the motor, the electrical switch should be fitted with overload protection device and adjust the size of the protection device according to the current requirements on the motor nameplate. Further reading: Motor IFAT China's top ten brands Guangzhou Exhibition building water pump manufacturers ranking ptc Show article belongs to Internet industry (Xiamen) Co., Ltd. All are welcome to reprint, please indicate the source and author of: Asian pumps Network Editor : Lindj (QQ / WeChat:) Starting: http://beng.liuti.cn/ (Service Hotline:)

Glass Washing Machine

Glass Washing Machine,Glass Wash Machine,Glass Washer and Drier

SHENZHEN HUACAI GLASS MACHINERY CO.,LTD , http://www.hcglassmachinery.com

没有评论:

发表评论